Close Menu
    What's Hot

    ‘You Won’t Regret Listening to Us’, Tinubu Tells Fubara at APC Rally in Rivers

    November 7, 2026

    ADC Urges Nigerians to Vote Out APC Over 570% Petrol Price Increase, Cites US Election

    November 7, 2026

    N200m SUV: Nigerian Pastor’s Request for Fuel Money Triggers Backlash on Facebook

    November 7, 2026
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram Vimeo
    Naija News House
    Subscribe Login
    • Home
      • Akwa ibom
      • Education
      • Relationship
      • Health
    • About us
    • Local News
      • Entertainment
      • Fct
      • Job
    • Corrections Policy
    • Editorial Policy
    • Terms and Conditions
    • Disclaimer
    • Contact us
    Naija News House
    • Homepage
    • News
    • Aso Rock
    • Crime
    • Uncategorized
    • Big Stories
    • Politics
    • Politics
    • Foreign News
    • National Assembly
    • Security
    • Education
    • Army
    • Entertainment
    • World News
    • Religion
    • Police
    • Terrorists
    • Church
    • Fct
    • Health
    • General News
    • Akwa ibom
    • Business
    • Relationship
    • Job
    • Insecurity
    • Food
    • Health
    • Marriage
    • Local News
    • EFCC News
    • Business
    • Court
    • Africa
    • Sports
    • Works Ministry
    • Interior
    • Recruitment
    • ICPC News
    • Uruan LG
    • NIDCOM News
    • Culture
    • NNPC
    • NHRC
    • Lifestyle
    • Wema Bank
    • TCN
    • GOMEP
    • Interview
    Home | TCN Commissions 330kV Turn-In Turn-Out Lines in Edo to Boost Power Evacuation
    TCN

    TCN Commissions 330kV Turn-In Turn-Out Lines in Edo to Boost Power Evacuation

    NNHBy NNHMay 15, 2026No Comments3 Mins Read
    WhatsApp Facebook Twitter Pinterest LinkedIn Tumblr Email Copy Link
    Share
    WhatsApp Facebook Twitter LinkedIn Pinterest Email Copy Link
    Spread the love
    TCN Commissions 330kV Turn-In Turn-Out Lines in Edo to Boost Power Evacuation

    The Transmission Company of Nigeria has commissioned the newly constructed Ihovbor/Benin and Ihovbor/Ajaokuta 330kV Turn-In Turn-Out transmission lines at the Ihovbor Transmission Substation, Edo State. The event took place today, 14th May, 2026.

    MD/CEO Engr. Dr. Sule Ahmed Abdulaziz described the project as a major milestone in strengthening Nigeria’s transmission infrastructure and improving transmission network reliability nationwide. He said the 14km double-circuit line links the existing Benin/Ajaokuta 330kV route to the Ihovbor substation, creating two new routes that increase operational flexibility and resilience in the Benin corridor.

    “The project has increased the operational flexibility of the transmission network and strengthened the resilience of power delivery within the Benin corridor,” Abdulaziz said. “It grants TCN the ability to more efficiently evacuate power generated by the Azura Power Plant and the Niger Delta Power Holding Company facility, alleviate transmission bottlenecks, and enhance system reliability.”

    He noted that the additional 600MW evacuation capacity will allow distribution companies access to more bulk electricity for customers nationwide. The circuit which was energised on 23rd April, 2026, has been in service since, with customers of distribution companies already benefiting from the project.

    Abdulaziz explained that TCN’s mandate is to transmit power from generating companies distribution load centres. “Our job is to transmit the power from the generators to the load centers. It is the responsibility of distribution companies to offtake and distribute to customers. With this project, distribution companies will have more bulk power available for industries and residential customers” he said.

    He reaffirmed TCN’s commitment to expanding transmission infrastructure to meet current demand and prepare for future growth, and called on host communities to support efforts to protect installations against vandalism.

    On his part, the Managing Director of Energo Nigeria, Predrag Mihel, said the project involved 30 towers and twin Bison conductors capable of supporting up to 1.5GW from the NIPP and Azura plants. He credited its completion to strong collaboration between TCN and ENERGO.

    Speaking at the event, the General Manager Engineering, Engr. Mojid Akintola, said the project was awarded in 2017 but faced challenges with right of way and funding, which have now been resolved.

    He thanked the Ihovbor host community, contractor Energo, and the entire TCN team, particularly the MD/CEO, for making today’s commissioning possible.

    The General Manager of Benin Region, Engr. Charles Iwuamadi said that the project adds over 600MW of wheeling capacity to the region and clarified that TCN is only a bulk transporter of electricity, does not distribute electricity to end users. Distribution companies directly interface with electricity consumers.

    Representing the Enogie of Ihovbor/Evbueka, Mr. Elliot Imafido commended TCN on the project but appealed that indigenes of the community be prioritised in employment and also that electricity supply to the host community be improved.

    TCN Commissions 330kV
    Share. WhatsApp Facebook Twitter Pinterest LinkedIn Tumblr Email Copy Link
    Previous ArticleCourt Jails two Fraudsters for N7m Fraud in Maiduguri
    Next Article IGP Disu Receives AU Ambassador Jagne As 54 African Countries Move To Adopt Nigeria Police Safe Schools Initiative Model
    NNH
    • Website
    • Tumblr

    Related Posts

    Power Outages: TCN Accuses IKEDC of Shifting Blame, Says Low Generation Responsible

    November 6, 2026

    Nigeria, Four Other West African Nations Push To Complete Regional 330kV Power Project

    November 5, 2026

    Nigeria Must Fix Gas Supply, Transmission Bottlenecks, Market Liquidity to Boost Power Supply — TCN MD

    October 29, 2026

    TCN Restores Karu–Keffi–Akwanga Transmission Line After Rebuilding Three Fallen Towers

    October 29, 2026

    Comments are closed.

    Our Picks

    How to Make Perfume Last Longer Than Before

    January 13, 2021

    Stay off Social Media and Still Keep an Online Social Life

    January 13, 2021
    Don't Miss

    ‘You Won’t Regret Listening to Us’, Tinubu Tells Fubara at APC Rally in Rivers

    By NNHNovember 7, 20260
    Spread the love

    ‘You Won’t Regret Listening to Us’, Tinubu Tells Fubara at APC Rally in Rivers President…

    ADC Urges Nigerians to Vote Out APC Over 570% Petrol Price Increase, Cites US Election

    November 7, 2026

    N200m SUV: Nigerian Pastor’s Request for Fuel Money Triggers Backlash on Facebook

    November 7, 2026

    BAYELSA BOAT ACCIDENT: Navy, Local Divers Rescue Commissioner, Six Others As Search Continues For Missing Police Officer

    November 7, 2026
    About Us
    Our Picks

    ‘You Won’t Regret Listening to Us’, Tinubu Tells Fubara at APC Rally in Rivers

    November 7, 2026

    ADC Urges Nigerians to Vote Out APC Over 570% Petrol Price Increase, Cites US Election

    November 7, 2026

    N200m SUV: Nigerian Pastor’s Request for Fuel Money Triggers Backlash on Facebook

    November 7, 2026
    Facebook X (Twitter) Instagram Pinterest
    • Homepage
    • Contact us
    • About us
    • Privacy Policy
    • Disclaimer
    {c© 2026 Naija News House. Designed by Domo Tech Hub.

    Type above and press Enter to search. Press Esc to cancel.

    Sign In or Register

    Welcome Back!

    Login to your account below.

    Lost password?